Skip to main content

Cameron to Milford Power Line cultural resources inventory, Beaver County, Utah, 2011-04

 File — Box: 25, Folder: 19, Item: UT no468

Scope and Contents

From the Collection:

The Alan Schroedl Collection consists of articles and archaeology reports Schroedl collected during his career. The majority of these items are publications who’s content related to the American Southwest focusing on Southern Utah, the Four Corners Area, and the Great Basin. Items include magazines, archeology reports, graduate thesis’ written by others, and reports generated by P-III Associates.

Dates

  • Creation: 2011-04

Access:

The Alan Schroedl Collection contains archeaology reports with sensitive site locations and data. Therefore, some items may be restricted. See individual items for restrictions.

Conditions Governing Use

Access restricted

Full Extent

From the Collection: 25.9 Linear Feet (31 containers)

Language of Materials

From the Collection: English

Physical Description

report

General

PacifiCorp (Rocky Mountain Power) proposes to construct a 15.43 mile long 138Kv overhead transmission line between the Cameron substation and Milford in Beaver County, Utah. As the action will take place on land managed by the Bureau of Land Management. (page i). Utah State Project No. U-10-SQ-0647pb WSA Technical Report No. 2010-64

Source

Repository Details

Part of the Special Collections and University Archives Repository

Contact:
351 W University Blvd
Library
Cedar City UT 84720 United States